Bucket Rescue
Insulated aerial device daily unit inspection • The daily checkout of an aerial device before traveling to worksite • conduct a pre-flight and pre operational inspectionManufacture recommendations • Engine inspection • Boom inspection • Hydraulic inspection • Chassis inspection • Synthetic load line and rigging equipment
Unit Set-up and pre-operational checks • Checking operating capacity • Working on slopes • Preparing boom for electrical work • Operating secondary stowage system
Unit operation • Checking PPE • The electrical continuity of the boom tip • The insulating properties of the boom • Basic do’s and don’ts while operating
Material handling • Load ratings • Calculating load weights and tensions • Maintenance and repair of load handling system • Precautions while working on electrical systems • Hand signals • Load capacities
Bucket rescue • From the chassis • From the bucket • From another structure
|